av 国产 日韩 欧美 在线播放

<big id="5brt0"><em id="5brt0"></em></big>
  • <object id="5brt0"></object>
  • <code id="5brt0"></code><code id="5brt0"></code>
  • <th id="5brt0"><sup id="5brt0"></sup></th><pre id="5brt0"></pre>

    <code id="5brt0"></code>
      Data Center Map

      Manitoba Hydro Telecom


      » Index » Canada » Winnipeg » Manitoba Hydro Telecom

      Manitoba Hydro Telecom is located in the area Winnipeg, Canada, and the colocation data center is carrier neutral. The data center was last updated on 15-11-2016.


      Address:
      Manitoba Hydro Telecom
      R3P1A3 Winnipeg
      Manitoba, Canada

      » Request quote
      » Visit website

      Click here to find other data centers
      owned and operated by Manitoba Hydro Telecom.
      * For security reasons this data center does not want its exact location publicly available.
      Therefore the address above is not the exact location, but it is within 360 Portage Ave..


      Profile
      Tenants
      Connectivity
      Request quote
      Office space
      Rack Cabinets
      Dedicated Servers
      Suites
      Footprints
      Virtual Servers
      Cages
      Hosting of individual servers
      Remote Hands

      Profile


      With Manitoba Hydro Telecom (MHT) you can access a stable, robust, and scalable environment for hosting databases, application servers, and file servers to meet your IT needs. MHT leases cabinets (racks) to clients on a monthly basis to colocate equipment.

      The MHT fiber network includes connections to 151 Front St. in Toronto and The Westin Building (Seattle Internet Exchange) in Seattle. You can also connect your equipment to the majority of Manitoba using Transparent LAN Services.

      Features:
      - UPS backup, diesel generators, and standard commercial power.
      - Carrier-neutrality provides you access to major telecommunications carriers.
      - Comprehensive physical security, climate control, fire control, 24/7 monitoring and support.
      - Space and electrical power can be increased as needed.

      Space Available:

      1/4 locked cabinet 20 amp AC/UPS
      1/3 locked cabinet 20 amp AC/UPS
      1/2 locked cabinet 20 amp AC/UPS
      Full locked cabinet 20 amp AC/UPS


      Manitoba Hydro Telecom Pricing/Quotes


      If you are interested in receiving a quote for Manitoba Hydro Telecom, please try our free quote service.

      Copyright © Data Center Map - Sitemap
      Your guide to colocation data centers, managed hosting, cloud servers etc.
      av 国产 日韩 欧美 在线播放
      <big id="5brt0"><em id="5brt0"></em></big>
    1. <object id="5brt0"></object>
    2. <code id="5brt0"></code><code id="5brt0"></code>
    3. <th id="5brt0"><sup id="5brt0"></sup></th><pre id="5brt0"></pre>

      <code id="5brt0"></code>